Well Done to the Lads for Completing Their Challenge!!
Welcome to our fundraising page for Birmingham Children’s Hospital and Prostate Cancer UK. Gavin, Rhys and Anthony completed their challenge to walk, cycle or run 62 miles in October. In addition, a few Sunday night football matches added some extra competition – read on to see who came out on top!






Gavin started and ended his 62 miles challenge with a walk with his mom. Despite a tough ride in week 2, he also completed a 12.5 mile bike ride with Anthony.
Anthony has done all of his miles on his bike and has enjoyed the company of his team mates on a couple of them.
Rhys moved house during the final week, so he struggled to complete all his miles. However, we will let him off, as he plans to finish his last few miles over the next few days.
A Note from Gavin, Anthony & Rhys.
“A massive thank you to everyone who donated, supported and encouraged us throughout this years fundraising. Its been harder than expected to fit in the miles but we have done it!”
The red team also won the football tournament winning 12-7 with Anthony Lewis being the ‘Player of the Tournament’.

Thanks to everyone’s incredible support, all donations totalled just over £1,500 which is amazing! In addition, a massive thank you goes to everyone who donated prizes for the football tournament. Your generosity made the event even more special. Also thanks to Warley Rugby Club who discounted the pitch fees. The prize draw was done on the random name picker wheel, excluding those who donated anonymously.
Here are the winners of the raffle.
- Paintball – Engmal
- Stourbridge Season Ticket – Anthony + the football lads
- 2 Tickets for Kum-n-avaloff Comedy Night – Adrian Hancock
- 2 Tickets to The Black Country Museum – Bellamy
- Cream Tea for 2 at Half Penny Farm – Louise (Jess Friend)
- 25 Lap race for 1 – Helena Homer
- 50% Voucher for Sleeping Beauty – Kerry Lewis
- 2 Course Meal at The Lawnswood for 2– Pauline & Tim Roberts
- 4 tickets at The Riverooms – Laura Glazzard
- 2 Tickets for The Black Country Museum – Liesl (Jess Friend)
- 2 tickets for the Safari Park – Louise Lewis
- The Glee Club 2 tickets – Nat & Dave
- Afternoon tea at The Copthorne Hotel – Maureen Bull
- Rodeos Meal for 2 – Charlie & James
Week 3 progress!
The October Charity Challenge update.
Gavin has upped his miles this week on a ‘longer than planned’ bike ride. Feeling good at 10 miles, he decided to add a few more miles, but regretted the decision by the time he reached Kinver – and cant we tell!!??!!
Anthony did another bike ride and is now at 45 miles in total.
Rhys may have only upped his total by 6 miles this week but is leading the fund raising.
There was a highly debated and controversial end to the week with regards to the football results too….after an ‘equaliser’ came 15 mins after the playing time and 2 red players off the pitch. However, it has been agreed that next week is a winner takes all match! Lets see who finishes on top!
Support the lads here: https://www.justgiving.com/team/midthermlaser?utm_medium=TE&utm_source=CL . Donate, and be entered in to a draw to win the prizes at the bottom of the page. All donations help and are greatly appreciated.





Week 2 progress!
Gavin added just over 6 miles this week on another local walk and a walk to watch Stourbridge FC play.
Anthony did another bike ride, adding another 14 miles to his total.
Rhys walked 5 1/2 miles.



The Sunday night tournament is now 1:1 as the blue team won week 1 and the red team won week 2.


Support the lads here: https://www.justgiving.com/team/midthermlaser?utm_medium=TE&utm_source=CL . By donating, you will be entered in to a draw to win the prizes below.
Week 1 progress!
Gavin is 5 miles in after 1 week, walking with his mom enjoying some fresh air. However, his football injury is slowing him down!
Anthony is 14 miles down. He has been on a bike ride and is leading the way after 1 week.
Rhys is 7 miles in but with that dog close behind, he will be upping the distance this week!



The Story – 1st October
The “62 Miles in October Charity Challenge” starts today!
Ant, Gavin and Rhys are taking on the challenge this month to raise money for two brilliant causes:
Prostate Cancer UK and Birmingham Children’s Hospital.


They will walk, jog, cycle or run the 62 miles while also challenging each other in their Sunday night football games. Who will come out on top?!?

Get Involved and Support here!
We are inviting you to get involved too! Click the link below to donate to any of the team, each £1 buys a raffle ticket to be in with a chance of winning some amazing prizes listed below. Your donation can make a big difference. We will contact the winners next month.
Support the lads here: https://www.justgiving.com/team/midthermlaser?utm_medium=TE&utm_source=CL
Write your name on the sponsor form or contact us directly after you donate. This way we can allocate your tickets and find the winners!
Prizes Include
Grand Theatre Wolverhampton– Can offer you one 50% off voucher for up to 6 tickets to SLEEPING BEAUTY. This voucher is valid for any GREEN or RED performances (subject to availability), from Saturday 29 November 2025 to Wednesday 17 December 2025, (excludes Saturday 13 December 2025 at 11am).
The Glee Club Bham – voucher code that can be used to redeem 2 free tickets for one of our regular Weekend Comedy shows, which will be valid for a 3-month period after your event (excluding December).
Stourbridge FC – Flexi Season Ticket, (12)
The River Rooms – Voucher for 4 tickets
West Midlands Safari Park – 2 tickets
Halfpenny Green– Cream tea voucher for two
Stourbridge Town Hall – ‘Kum-n-avaloff’ Comedy Night 2 tickets
Full Throttle Raceway – 25 Lap Race for 1
Delta Force Paintball – 3 Hour paintball session for 10 players, voucher Valued at £100.00
Black Country Museum – 2 Tickets
Black Country Museum – 2 Tickets
Copthorne Hotel – Afternoon Tea for 2
Rodeos Wolverhampton – Free meal and drink for 2
The Lawnswood Worsley – 2 course meal for 2 plus a bottle of wine



